Laying of Hedges
Date published: 30 March, 2015
Aim
The aim of this item is to help maintain or restore an existing hedge.
Laying hedges by partially cutting through each stem and weaving them together produces a dense living barrier which helps extend the lifespan of the hedge.
Eligibility
Existing hedges which are located entirely on your land and where there is access for both sides to be cut are eligible. Single species beech hedges are not eligible.
You must combine this item with the Management or Restoration of Hedgerows option.
Areas to be laid can only be claimed once during your contract.
Application requirements
You must mark the proposed location(s) of the hedge(s) to be laid on a map.
Requirements
- you must lay the hedge between 1 September and the 31 March (inclusive)
- cut material must be either mulched or removed from the site
Payment
You can claim £12.50 per metre of hedge laid.
To support hedgerow restoration or management, you can select this item with one of the following items:
Inspections
The inspectors will check:
- the location and extent of the work
- you have laid the hedge between 1 September to 31 March (inclusive)
- cut material has been either mulched or removed from the site
Additional guidance
Download guidance
Click 'Download this page' to create a printer-friendly version of this guidance that you can save or print out.