Path Bridge (Over 1 Metre, Steel Beam)
Date published: 30 March, 2015
This is to supply and install a path bridge.
The path bridge must be treated timber frame with steel beams and is for crossings of over one metre in width. It must be constructed in accordance with the Path Bridges guide.
The width of the usable bridge deck must be a minimum of 1.2 metres.
Each completed bridge construction requires certification to ensure the necessary insurance requirements are approved to allow for use by the public.
Your Woods In and Around Towns Operational Plan map must clearly identify where the path bridge will be positioned.
Further information
Please ensure you abide by conditions set out in the Forestry Grant Scheme claim form and guidance.
Download guidance
Click 'Download this page' to create a printer-friendly version of this guidance that you can save or print out.