Rural Sustainable Drainage Systems – Sediment Traps and Bunds
This is an old version of the page
Date published: 11 March, 2016
Date superseded: 17 January, 2017
To see recent changes to this guidance, check the bottom of this page.
Aim
The aim of this item is to improve water quality by creating a strategically placed sediment trap and / or bund to intercept run-off that currently discharges direct to a watercourse or freshwater drain.
Eligibility
Any land is eligible, provided that it meets all of the requirements set out below.
You must combine this item with:
Where a sediment trap is to be created to accept run-off from a steading, you must combine this item with:
Spatial targeting
You can check if this item is available on your holding here.
Application requirements
You must prepare a plan which must include a map of the relevant fields / steading identifying the location of the rural sustainable drainage system feature.
You must also produce a diffuse pollution steading assessment.
Requirements
- bund height must be less than 1.3 metres, unless designed by a qualified engineer
- fencing must be provided to protect people and livestock.
- only run-off which does not fall within the definition of slurry may be conveyed to a sediment trap / bund *
- run-off from pesticide handling or washdown areas must not be conveyed to a sediment trap / bund
* Unless the run-off is being conveyed to a constructed farm wetland designed in accordance with the Constructed Farm Wetland Design Manual – Scottish Environment Protection Agency / Northern Ireland Environment Agency – 2008.
Payment
You can claim:
- excavate and form sediment trap – £10.50 per square metre
- create bund – £7.20 per linear metre
Inspections
The inspectors will check:
- the location and extent of the sediment trap
- the length of the newly created bund
- bund height is less than 1.3 metres, unless designed by a qualified engineer
- fencing is provided to protect people and livestock
- only run-off which does not fall within the definition of slurry is conveyed to a sediment trap / bund *
- run-off from pesticide handling or wash-down areas is not conveyed to a sediment trap / bund
* Unless the run-off is being conveyed to a constructed farm wetland designed in accordance with the Constructed Farm Wetland Design Manual – Scottish Environment Protection Agency / Northern Ireland Environment Agency – 2008.
Additional guidance
Recent changes
Section | Change | Previous text | New text |
---|---|---|---|
Application requirements | Clarification of requirements. | - | You must also produce a diffuse pollution steading assessment. |
Previous versions
Download guidance
Click 'Download this page' to create a printer-friendly version of this guidance that you can save or print out.