Water Margins in Grassland Fields
This is an old version of the page
Date published: 6 January, 2015
Date superseded: 9 January, 2017
To see recent changes to this guidance, check the bottom of this page.
Aim
The aim of this option is to benefit a variety of wildlife, and help improve water quality and the physical condition of watercourses.
Water margins immediately adjacent to still or running water, including ditches which may be dry for part of the year, can help improve water quality by preventing soil erosion, intercepting surface water run-off and improving soil structure.
Water margins can provide cover and food for birds and small mammals, as well as flowers for pollinating insects. They are also important for connecting habitats.
Eligibility
Any grassland adjacent to still or flowing water (e.g. rivers, burns, ditches or lochs) with an existing water margin, or where you propose to create a new water margin, is eligible.
You can manage any width of margin, but the following minimums apply (along the entire length of the margin):
Location of water margin | Minimum width of water margin* |
---|---|
Adjacent to a watercourse with a bed width (less then or equal to 1.2 metres) | 3 metres |
Adjacent to a watercourse with a bed width (greater than 1.2 metres) | 6 metres |
Adjacent to still water | 12 metres |
* The minimum width applies from the top of the bank.
Spatial targeting
You can check if this option is available on your holding here.
Application requirements
You must identify on a map the location(s) of any water margin(s) to be managed.
Complete the template below to describe all your water margins.
Management requirements
This option must be maintained at the same location(s) and extent for the duration of your contract.
For water margins of at least three metres and less than six metres
- you must exclude all livestock
- if cutting, you must not cut before 15 August and you must remove cuttings
For water margins of at least six metres, or wider
- you must cut and / or graze the area subject to payment, unless you have prior approval not to
- if cutting, you must not cut before 15 August and you must remove cuttings
- if grazing, you must not graze the water margin or associated banking between 1 May and 15 August, or between 1 May and 15 September if the land is within a bathing water catchment
- do not carry out supplementary livestock feeding
For all water margins
- do not allow the land to become poached or vehicle tracked
- do not plough, cultivate or use the area for regular vehicle access or storage
- do not spray, except for the spot-treatment of injurious weeds (requires prior written notification) or treatment of invasive species (requires prior written approval)
- do not apply fertiliser, farmyard manure or slurry
- you must maintain a diary
Payment
You can claim £123.42 per hectare per year.
The maximum eligible width of a margin is 18 metres.
The maximum width you can claim is 18 metres next to a watercourse. This is because only activity which is in excess of legal requirement (e.g. GAEC / GBRs) is eligible for payment. The eligible area for this option will start from the edge of the two metre strip required under GAEC. This will mean that if you manage a 20-metre wide margin from the top of the bank of a watercourse, only 18 metres of the margin (20 metres minus 2 metres) will be eligible for payment.
Inspections
The inspectors will check:
- the margin is in a grass field
- the margin is at least the appropriate minimum width for the bed width of the watercourse
For water margins of at least three metres and less than six metres
- that all livestock has been excluded
- if cutting, it must not have been cut before 1 August and cuttings have been removed (with the exception of topping to aid establishment during the first year)
For water margins of six metres or wider
- you must cut and / or graze the area, unless you have prior approval not to
- if grazing, you must not graze the margin or associated banking between 1 May and 15 August, or between 1 May and 15 September if the land is within a bathing water catchment
- if cutting, you must not cut before 15 August and you must remove cuttings (with the exception of topping to aid establishment during the first year). You are only required to cut the margin from the top of the bank
- do not carry out supplementary livestock feeding
For all water margins
- that there has been no ploughing, cultivation, storage,
- that the area has not become poached or vehicle tracked
- that there has been no application of fertiliser, slurry or farmyard manure
- you have not sprayed, unless with prior written notification or approval as appropriate
- you have maintained a diary
Note
If you choose to apply for this option over the same area of land that you are allocating as an Ecological Focus Area to meet your Pillar 1 greening requirements, there may be an issue of double funding.
Additional guidance
Recent changes
Section | Change | Previous text | New text |
---|---|---|---|
Aim | Clarification of the aim. | The aim of this option is to benefit a variety of wildlife, and help improve water quality. | The aim of this option is to benefit a variety of wildlife, and help improve water quality and the physical condition of watercourses. |
Spatial targeting | Updated target area map. | - | - |
Removal of the sentence in the caption below the PDF that referred to applications outwith the designated areas. | It may be possible to apply for this option outside this area where there is strong justification as endorsed by Scottish Natural Heritage. | - | |
Application requirements | Addition of a template for the description of water margins. | n/a | Complete the template below to describe all your water margins. [Word document] |
Payment | Amendment to information regarding the maximum eligible width of a margin. | The maximum width you can claim is 18 metres next to a watercourse. This is because only activity which is in excess of legal requirement (e.g. GAEC / GBRs) is eligible for payment. Under GAEC 1 you must not cultivate or apply pesticides within two metres of the top of the bank of a watercourse. The eligible area for this option will start from the edge of this two metre strip. This will mean that if you manage a 20 metre wide margin from the top of the bank of a watercourse, only 18 metre of the margin (20 metres minus 2 metres) would be eligible for payment. | The maximum width you can claim is 18 metres next to a watercourse. This is because only activity which is in excess of legal requirement (e.g. GAEC / GBRs) is eligible for payment. The eligible area for this option will start from the edge of the two metre strip required under GAEC. This will mean that if you manage a 20-metre wide margin from the top of the bank of a watercourse, only 18 metres of the margin (20 metres minus 2 metres) will be eligible for payment. |
Previous versions
Download guidance
Click 'Download this page' to create a printable version of this guidance you can save or print out.